Best Foods Bucharest, Timișoara Boulevard
Expanding production capacity is not only about increasing volumes, but also about adapting the critical infrastructure that supports daily operations. In the food industry, where processes are continuous and energy consumption is high, strengthening the energy source becomes an essential part of the growth strategy. After the first project delivered together, Best Foods Bucharest chose to continue investing in self-generated energy by installing a new 420 kWp photovoltaic system at the Bd. Timișoara location. This decision reflects a coherent long-term approach to operational stability. The solution supports the facility's constant industrial load and provides greater independence from energy market fluctuations, helping optimize costs and strengthen financial predictability.
Project Features
Project Video
Photo Gallery
Other Projects
Best Foods Bucharest, Iuliu Maniu
The food industry involves continuous production processes, high-consumption industrial equipment, and a constant need to control operating costs. In this context, energy becomes a critical factor for financial stability. For Best Foods Bucharest, the 432 kWp photovoltaic system was implemented as a strategic investment in energy efficiency. The solution was sized according to the production facility's real consumption, turning industrial roof area into an in-house energy source and significantly reducing long-term cost pressure.
Kronospan
5901 kWp industrial project implemented for Kronospan in Alba County, delivered in Light EPC mode.
Regalina
In the agricultural sector, operations are continuous, and energy costs directly influence production efficiency. For Regalina in Râșnov, a farm specialized in egg production, electricity is an essential part of daily activity. At this farm, solar energy became a stable and efficient in-house resource. We installed 396 photovoltaic panels and two Huawei 100 kW inverters, turning the farm roof into a green energy source aligned with real consumption needs. The entire system was delivered end-to-end, from contract to commissioning, in only two and a half weeks, exclusively with our own teams.