Prosoft Făgăraș
After the projects delivered together in Brașov and Miercurea Ciuc, our partnership with Pro Soft Grup continued in Făgăraș. As a result, strengthening energy infrastructure became an integral part of the organization's management strategy, not just a one-off initiative. Extending the investment to a new location reflects a group-level unified approach in which energy stability and cost control are treated as essential elements for long-term growth. Standardizing the implemented solutions enables performance optimization and more efficient energy resource management across all operating sites. The 101 kWp photovoltaic system, consisting of 202 panels and two Huawei 40 kW inverters, supports the location's specific consumption and contributes to operating cost efficiency, while also improving financial predictability in a dynamic economic context.
Project Features
Photo Gallery
Other Projects
Best Foods Bucharest, Iuliu Maniu
The food industry involves continuous production processes, high-consumption industrial equipment, and a constant need to control operating costs. In this context, energy becomes a critical factor for financial stability. For Best Foods Bucharest, the 432 kWp photovoltaic system was implemented as a strategic investment in energy efficiency. The solution was sized according to the production facility's real consumption, turning industrial roof area into an in-house energy source and significantly reducing long-term cost pressure.
Best Foods Bucharest, Timișoara Boulevard
Expanding production capacity is not only about increasing volumes, but also about adapting the critical infrastructure that supports daily operations. In the food industry, where processes are continuous and energy consumption is high, strengthening the energy source becomes an essential part of the growth strategy. After the first project delivered together, Best Foods Bucharest chose to continue investing in self-generated energy by installing a new 420 kWp photovoltaic system at the Bd. Timișoara location. This decision reflects a coherent long-term approach to operational stability. The solution supports the facility's constant industrial load and provides greater independence from energy market fluctuations, helping optimize costs and strengthen financial predictability.
Kronospan
5901 kWp industrial project implemented for Kronospan in Alba County, delivered in Light EPC mode.