Dexion
In logistics and industrial warehousing, efficient operation depends on energy continuity: extensive lighting, automated racking systems, and handling equipment that sustain daily goods flow. For Dexion in Râșnov, the stability of these processes is directly linked to stable energy costs. The 32 kWp photovoltaic system was sized for the site's specific industrial consumption and integrated into existing infrastructure without disrupting current operations. In-house energy production contributes to cost efficiency and higher financial predictability in a sector where optimizing every square meter matters.
Project Features
Photo Gallery
Other Projects
Best Foods Bucharest, Iuliu Maniu
The food industry involves continuous production processes, high-consumption industrial equipment, and a constant need to control operating costs. In this context, energy becomes a critical factor for financial stability. For Best Foods Bucharest, the 432 kWp photovoltaic system was implemented as a strategic investment in energy efficiency. The solution was sized according to the production facility's real consumption, turning industrial roof area into an in-house energy source and significantly reducing long-term cost pressure.
Best Foods Bucharest, Timișoara Boulevard
Expanding production capacity is not only about increasing volumes, but also about adapting the critical infrastructure that supports daily operations. In the food industry, where processes are continuous and energy consumption is high, strengthening the energy source becomes an essential part of the growth strategy. After the first project delivered together, Best Foods Bucharest chose to continue investing in self-generated energy by installing a new 420 kWp photovoltaic system at the Bd. Timișoara location. This decision reflects a coherent long-term approach to operational stability. The solution supports the facility's constant industrial load and provides greater independence from energy market fluctuations, helping optimize costs and strengthen financial predictability.
Kronospan
5901 kWp industrial project implemented for Kronospan in Alba County, delivered in Light EPC mode.