Pro Arena
Running a sports facility requires lighting, specific equipment, locker rooms, and auxiliary spaces used daily, generating steady energy consumption throughout the year. For Pro Arena Brașov, optimizing these costs means directing more resources toward sports activity development. The 12 kWp photovoltaic system was sized according to the facility's real needs so that energy production supports daily operations without disruption. The investment helps reduce operating costs and supports a more efficient and sustainable sports base in the long term.
Project Features
Project Video
Photo Gallery
Other Projects
Stehos Acero Chitila
316 kWp photovoltaic system for a manufacturer of welded mesh and wire products for construction. Energy produced on the roof, right where industrial consumption is highest.
Elta 90 Medical Research Chiajna
77 kWp solar carport with 4 electric vehicle charging stations. The car park becomes an energy source for the company and its electric fleet.
Fresh-Fruits Logistics
58 kWp photovoltaic system with 61 kWh of batteries for a fresh fruit and vegetable distributor. Energy for controlled-condition storage, even after sunset.