Prosoft Brașov
In the food industry, operational efficiency is tightly linked to fixed-cost control, and energy is one of the major factors. In a context where prices can vary significantly from year to year, reducing dependence on the energy market becomes a strategic decision, not just a technical optimization. For Prosoft Brașov, the 112 kWp photovoltaic system, consisting of 234 panels of 480 W and a 100 kW inverter, was sized according to the activity's real consumption, supporting the company's energy stability. The investment contributes to lower operating expenses and strengthens a sustainable energy infrastructure.
Project Features
Photo Gallery
Other Projects
Stehos Acero Chitila
316 kWp photovoltaic system for a manufacturer of welded mesh and wire products for construction. Energy produced on the roof, right where industrial consumption is highest.
Elta 90 Medical Research Chiajna
77 kWp solar carport with 4 electric vehicle charging stations. The car park becomes an energy source for the company and its electric fleet.
Fresh-Fruits Logistics
58 kWp photovoltaic system with 61 kWh of batteries for a fresh fruit and vegetable distributor. Energy for controlled-condition storage, even after sunset.